Hardware Switch Settings
Before beginning the mechanical installation, the various switches should be set to their correct
position while they are easily accessible.
position while they are easily accessible.
illustrates the
configuration switch locations on the CPU Board, Expansion Board, Series 100 Plus Option
Board, and Field Connection Board.
Board, and Field Connection Board.
Figure 3-16 Daniel 3400 Series Gas Ultrasonic Flow Meter Wiring Switch Settings
Table 3-23 Case Ground Jumper Settings
Jumper
Location
Description
J3
Field Conn. Bd.
Pin 1 Case Gnd
Pin 2 Case Gnd
Pin 2 Case Gnd
Table 3-24 Digital Input Connector
Jumper
Location
Description
J18
Field Conn. Bd.
Pin 1 DIN+
Pin 2 DIN-