SYNC (Synchronization) 
9
System Technician-Demanded Tests: Descriptions 
and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system.
If Stratum 3 is administered via change synchronization, the Stratum 3 Clock 
Alarm Query test (test #649) will also execute when the test synchronization 
command is run. Test 649 is described in the STRAT-3 section.
Test Synchronization Test (#417)
This test updates all the Synchronization Maintenance component circuit packs 
with the correct information regarding their role in providing synchronization for 
the system. All the Tone-Clock, Expansion Interface, DS1 Interface and UDS1 
Interface circuit packs in the system are updated via this test. This test will either 
pass or abort.
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
1.
D = Destructive, ND = Non-destructive
Test Synchronization Test (#417)
X
X
ND
Table 9-598.
TEST #417 Test Synchronization Test 
Error 
Code
Test 
Result
Description/ Recommendation
1000
ABORT
System resources required to run this test are not available.
1. Retry the command at 1-minute intervals a maximum of 3 times. 
1115
ABORT
Could not allocate the necessary system resources to run this test. 
1. Retry the command at 1-minute intervals a maximum of 3 times. 
2500
ABORT
Internal System Error 
1. Retry the command at 1-minute intervals a maximum of 3 times.
PASS
The Synchronization Maintenance component circuit pack parameters have 
been successfully updated. The system should be synchronized after 
successful execution of this test. If synchronization problems still exist, refer to 
the Error Log to obtain information regarding the source of the problem.
Continued on next page