Parallel Compressor Systems Installation & Operations Manual, October 2004  
33
Parallel Compressor Systems
General Maintenance Schedule
(Service/Maintenance should be performed only by a qualified 
/ certified refrigeration service technician.)
Weekly
Check refrigerant charge using the liquid line sight glass
Check compressor oil level
Check compressor crankcase heater operation
Check main power and control voltage
Check appearance of area around the unit
Check system pressures
Monthly
Check the refrigerant system for leaks
Check suction filters and liquid line filter driers.
Check all flanged connection bolts, fittings and line clamps 
for tightness.
Inspect condenser fan blades and motor mounts for cracks, 
loose set screws or mounting bolts.
Tighten all electrical connections.
Check operation and condition of contacts on compressor/
fan motor contactors. Check appearance of control panel 
interior.
Check appearance of exterior conduit/junction boxes.
Check appearance of insulation.
Check operation of auxiliary equipment.
Quarterly










With unit in stable operation, record all operating conditions:
Suction/discharge/liquid  refrigerant  pressure(s)  and 
temperature(s).
System  superheat,  liquid  subcooling,  ambient 
temperature.
Compressor amperage.
Test all operating and safety controls.
Annually
Obtain oil sample for analysis. Change oil if required.
Clean condenser coil.
Straighten condenser fins as required.
Change liquid line filter drier and suction filter cores.




 
Note:  The above information is provided only  
 
 
  as a general guideline to aid servicing  
 
 
  personnel and equipment owners in  
 
 
  maintaining equipment. Due to variables  
 
 
  in the actual equipment application,  
 
 
  operating conditions, and environment  
 
 
  recommended service intervals may vary.