Avaya 585-229-770 Benutzerhandbuch

Seite von 139
DNM-UNIX Release 4.0 Installation and Getting Started 
Installing and Upgrading DNM
Technical Verification Checklist
December 2001
Page 38
Technical Verification Checklist
At the completion of the DNM installation, the engineer at the Technical Services Center 
(TSC) must complete the tasks below to insure that DPA is properly administered and 
functioning: 
1
Verify that the customer completed and faxed PA001 Administration Request form 
(Rev. 10/01) to the TSC.
2
Verify that the TSC has updated the System Management database with the current 
data from the PA001 form.
3
Verify that Auto-Discovery works on the public or private network. Refer to 
 
4
Generate an exception event. Verify the object colors for the exception status 
correctly displays on the root map, submaps, and DEFINITY Network Management 
screens. Refer to 
.
5
In addition, check the information below:
• Verify that the Proxy Agent and the NMS can receive alarms from each managed 
node
• Verify that the TSC and the NMS can receive alarms from each managed node
6
For Avaya legacy systems that are connected to an Avaya Trouble Tracker, telnet to 
the Avaya Trouble Tracker and verify the status of the legacy systems. Refer to