Transferring from Generator Power to Utility Power: 
1. 
On the transfer switch, turn Generator MAIN breaker OFF and turn Utility MAIN breaker ON. 
2. 
Turn ON any branch circuit breakers in the transfer switch that are OFF. 
3. 
Shut down the generator, following the procedures in the generator Owner’s Manual. 
4. 
Unplug the power cord from the generator and then the power inlet. 
5. 
Cool off the generator and store in a dry, secured location. 
6. 
To ensure that your generator will work properly when you need it, it is important to start and run your generator under load regularly and keep the tank filled with fresh fuel.  
Perform the above steps at least ONCE A MONTH to keep the generator properly “exercised.”  It is not necessary to turn off any circuits in the MAIN load center when supplying 
generator power to the transfer switch.
 
 
TABLE 2 - Wire Connector Usage Chart: 
WIRE SIZE 
12 
10 
14 
Red NA  NA NA 
12 
Red Red  NA NA 
10 
NA Red NA NA 
NA NA Blue 
Blue 
NA NA Blue 
Blue 
 
 
TABLE 3 – Compatible Circuit Breaker Types: 
 
Compatible GFCI, Arc-Fault/ Surge Protection Circuit Breakers: 
♦ 
Siemens QP, QT, QPH, HQP, QPF, QPHF, QFP, QE, QEH 
 
♦     Siemens: QPF (GFCI), QAF (Arc Fault), QP (Surge Protector) 
♦ 
Westinghouse Series BD, BR, BQ, GFC 
♦ 
Challenger Type A, C, HAGF  
♦ 
Square D Series HOM 
♦ 
GE Series THQL 
 
  
 
 
TYPICAL HARDWIRING 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 Gen/Tran Corporation 
P.O. Box 1001, Alpharetta, GA  30009-1001 
Toll Free 1-888-GEN-TRAN   Fax:  770-552-7756 
www.gen-tran.com 
© 2002-2004 Gen-Tran Corporation.  All Rights Reserved.  PowerStay is a registered trademark of Gen-Tran Corporation  . 
 
 
 
PN  50050      Rev C     3-25-04