Lucent Technologies 555-233-115 Benutzerhandbuch

Seite von 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Upgrading R5r/R6r/R7r to R8r without Adding Memory 
2-10
Upgrade the software and hardware 
2
Lock the active SPE (H/C only)
1. Type status spe and press 
Enter
 to determine which control carrier is active 
or observe the control carrier LEDs.
NOTE:
For high or critical reliability systems, we recommend that you 
replace the circuit packs in the standby carrier first.
!
CAUTION:
When replacing any hardware, be sure to ground yourself against 
electrostatic discharge (ESD) by wearing a grounded wrist strap.
2. Move the SPE-SELECT switches on both Duplication Interface (DUPINT) 
circuit packs, 
one at a time, to the active carrier. 
Check the Active Tone-Clock (H/C only)
1. Type status port-network 1 and verify that the Tone-Clock is in the same 
carrier as the active SPE and that the 
Service State
 field shows in.
NOTE:
This takes 1 minute to complete. If the service state is incorrect, 
repeat the command until this condition is met.
If the active Tone-Clock has not migrated to the active carrier after 
1 minute, then a Tone-Clock problem exists. Refer to the TDM-CLK 
Maintenance Objects section of the 
DEFINITY Enterprise Communications 
Server Release 8 Maintenance for R8r book to resolve any problems.
Power Down the Processor Carrier
!
CAUTION:
Do not power down the whole cabinet; it is not necessary.
For standard reliability, power down the processor carrier. This causes a service 
interruption.
For high or critical reliability, power down the standby carrier.
1. To power down the processor carrier, remove the power plug from the 
left 
side of the carrier, then remove the power plug from the right side of the 
carrier.