4.  If equipped; adjust the four leveling bolts on the floor stand blender support rails. 
5.  Mount the material conveying system receivers on the top of the blender supply 
hoppers.  
6.  Align the weigh hopper on the load cell brackets. Carefully adjust the load cell 
brackets to ensure that the weigh hopper is centered on the brackets without rocking. 
If for some reason the locating tabs do not align with the weigh hopper, they can 
easily be loosened and adjusted. 
Note:   Use extreme care when tightening bolts on top of the load cells so you do 
not spring the load cells. The load cells are extremely delicate and should 
be treated with care! 
7.  Check the slide gate metering assemblies to ensure they are not damaged, and will 
slide back and forth freely. These are the most important items on the blender, 
besides the load cell and weigh hopper assemblies. 
Site Requirements 
This section describes site requirements in detail. These requirements are broken down into 
mechanical mounting, electrical connections and pneumatic connections. Since the Slide Gate 
Blender is available in several different mounting arrangements, it is necessary for the reader 
to become familiar with the different arrangements. 
Mounting Configurations 
The Slide Gate System is available in (3) three basic mounting arrangements. They are: 
•  Machine Mount 
•  Mezzanine Mount 
•  Floor Mount 
Machine Mount  
In a machine mounting application of the Slide Gate unit, there are a few items to review 
before placement and mounting of the blending system begins. 
First, verify the machine flange dimensions match the Slide Gate blender flange (if the 
optional pre-drilled holes were ordered). The Slide Gate blender can also be equipped with an 
optional cast throat section with a drain port. This will bolt under the bottom plate of the 
blender. 
Verify that the machine throat is physically capable of supporting the Slide Gate blending 
system with a full load of material and vacuum loading equipment installed. 
Note:   While in operation, the Slide Gate blender applies horizontal and 
vertical pressures to the mounting flange. If there is a question as to the 
mechanical stability of a mounting flange, contact the manufacturer’s 
engineering department. 
Verify all clearances on the top and beside the processing machine. This is to insure that all 
motors, hoppers, control panels, etc. have adequate room for proper operation and servicing. 
Refer to the assembly drawing with the unit for actual height and width dimensions. 
Note:   Allow at least 36” clearance around blender to provide adequate room 
for cleaning, servicing, etc. 