GE GCG1500 BB Benutzerhandbuch
![GE](https://files.manualsbrain.com/attachments/ab9edb4caba5619c2fde3c8024ebd3386de893ab/common/fit/150/50/5e42700264754ddc6c8abde125a62fae9215a8ad130cb92d4b61e1d54d06/brand_logo.jpeg)
Installation Preparation
6
UNPACKING THE COMPACTOR
1
• Move the compactor close to the installation
location.
• Use a section of the shipping carton to protect the
finished floor.
• Do not use the handle to lift the compactor.
• Remove all protective packaging materials such as
tape or shipping pads. Remove waxy residue caused
by shipping material with a mild solution of liquid
household cleaner and water.
by shipping material with a mild solution of liquid
household cleaner and water.
• Check that the power supply cord is attached to the
cord clip on the rear of the compactor.
IMPORTANT: Use the shipping carton as a pad.
Do not slide the compactor across a finished floor.
Damage will occur.
Do not slide the compactor across a finished floor.
Damage will occur.
Cord clip
UNPACKING THE COMPACTOR
(CONT.)
• Open the compactor drawer and remove any
shipping materials or other items shipped in the
drawer.
drawer.
• Do not remove the compactor bag (if installed).
• Grasp the sides of the drawer and lift it out of the
compactor. Place the drawer on a protected surface.
The drawer can scratch a finished floor.
The drawer can scratch a finished floor.