Gate Operator Installation Checklist
 
 
 
1 .  The gate has been checked to make sure it is level and moves freely in both directions .
 
 
 
2 .  Potential pinch areas have been guarded so as to be inaccessible 
OR have 
contact and/or non-contact obstruction sensing devices installed .
 
 
 
3 .  The installer has installed one or more contact or non-contact obstruction sensing 
devices, in compliance with UL325 requirements for this installation .
 
 
 
4 .  If pedestrian traffic is expected, a separate pedestrian gate has been 
installed, a minimum of seven feet from the gate . The customer has been 
informed that all pedestrian traffic must use the pedestrian gate .
 
 
 
5 .  Warning signs have been installed on each side of the gate in highly visible locations . 
The customer has been informed that these signs must remain at all times .
 
 
 
6 .  There are no controls installed on the gate operator, or within seven feet of the gate .
 
 
 
7 .  The installer has properly adjusted the obstruction sensing feature and has tested 
the gate to make sure that the gate stops and reverses a short distance with minimal 
resistance applied (40 lbs . on a swing gate at the end of the gate, 75 lbs . on a slide gate) 
 
 
 
8 .  The installer has instructed the customer in the proper use of the gate operator and reviewed 
all of the operational functions, obstruction sensing devices, warning beeper and reset, etc .
 
 
 
9 .  The installer has instructed the customer in the proper use of the operator’s 
manual disconnect feature . The manual disconnect must never be used 
while the gate is in motion . The power switch must be turned off before 
using the manual disconnect and disengaging the operator .
 
 
 
10 .  The installer has reviewed all safety instructions with the customer, and has left 
the safety instructions and owner’s information sheets for their reference .
 
 
 
11 .  The installer has answered any questions the customer has regarding the 
operation of the gate operator and gate operator safety precautions .
 
 
 
12 .  The installer has explained to the customer that a regular maintenance 
schedule for both the gate and the gate operator is recommended .
By signing this installation checklist, I/we hereby certify that each item listed and checked above has been covered by the 
installer and is clearly understood by the customer .
INSTALLER CUSTOMER
Customer’s Signature