Bunn FPG-2 DBC Bedienungsanleitung

Seite von 7
3
ELECTRICAL REQUIREMENTS
 
This grinder has an attached cordset and requires 2-wire, grounded service rated
:
 
120 volts ac, 15 amp, single phase, 60 Hz, for domestic grinders.
 
230 volts ac, 10 amp, single phase, 50 Hz, for most international grinders. 
 
100 volts ac, 15 amp, single phase, for some international grinders.
OPERATING CONTROLS
Grind Pad (a)
 
Pressing GRIND initiates a timed grind cycle.
Stop Pad (b)
 
Pressing STOP ends the operation of the grinder.
® PAD (c)
Pressing the ® pad allows programming access 
(see page 5).
Hopper/Batch Selector Pads (d)
 
These pads are located on the funnel depictions on each side of the grinder with a total of 6 pads.  Selecting 
one of these pads will select the amount of grind and side from which to grind.
 
Example:  Selecting the lower pad on the left side will grind enough beans from the left side of the grinder 
to brew the amount programmed into grinder.
Control Board
The control board determines the amount of beans that will leave the hopper in a grind cycle. The timer por-
tion can be adjusted to dispense a different amount from each hopper and each batch size. The scale is from 0.4 
to 99.9 seconds.  Refer to the Adjustments section for timer setting chart (page 5).
USER NOTICES
 
Carefully read and follow all notices on the grinder and in this manual.  They were written for your protection. 
All notices on the grinder are to be kept in good condition.  Replace any unreadable or damaged labels.
#20545.0000
KEEP FINGERS AND
FOREIGN OBJECTS
OUT OF HOPPER
OR CHUTE OPENING.
PERSONAL INJURY
HAZARD.
#05876.0000
36705  041207
d
d
c
b
a
#37881.0000