Newco iq2000p Bedienungsanleitung

Seite von 12
- 2 -
Installation Instructions
WARNING:
 - Read and follow installation / setup instructions before plugging or wiring in machine to electrical
circuit. Warranty will be void if machine is connected to any voltage other than that specified on the name plate.
PLUMBER'S INSTALLATION INSTRUCTIONS
CAUTION:
 Power to brewer must be OFF before proceeding with plumbing installation.
1)
Plumb brewer in to water supply using 1/4 inch copper or plastic tubing. Flush water line before installing 
brewer to remove sediment. Brewer should be connected to COLD WATER LINE for best operation.
2)
Water pressure should be at least 20 lbs. For less than a 25 ft. run, use 1/4" tubing and connect to 1/2" or 
larger water line. The inlet water fitting extending from the solenoid valve on the back of the brewer is a 
1/4" compression type fitting.
3)
Once the brewer is pressurized plug the brewer into a 120 volt power supply.
Brewer Fill Program
Programming is done through the 4 hidden buttons located under the display. Prior to accessing the
program or service mode you will need to attach a service template to the faceplate of the unit in order to locate
the buttons. Attach one of the self stick templates to the faceplate aligning it with the display window edges and
bottom border as shown in Fig 1 below.
Turn the main ON/OFF switch located on the lower left front of brewer column to the OFF position.
Depress and hold down both the Brew and Cancel buttons located on the brewer face plate (See Fig 1 below).
Continue to hold the two buttons in while turning the ON/OFF switch to the ON position. The brewer display will
indicate to "Please Wait" as it initializes the Program/Service mode. Continue holding the brew and the cancel
button until the brewer enters the Program/Service main menu (approximately 5 seconds).
Figure 1 - Faceplate
This is the Program/Service main menu. Use the Select key to choose the service
mode. Continue to depress the Select button until you reach the "Fill Tank Press
Brw1" message. Depress the Brew switch and the brewer filling process will begin.
The brewer fill process will take between 4 and 5 minutes. The tank heater in the brewer will automatically turn on
when the water makes contact with the heater safety probe. This will prevent damage to the tank heater from
turning on the element to early. The brewer will continue to fill until the water level in the tank reaches the upper
probe. The Tank Fill Program does not have a maximum run time to provide overfill protection. The brewer
heating system will take approximately 15 minutes to reach the preset temperature of 205 degrees.
Select Mode
Program      Service
CANCEL
BREW
HALF
BREW
Service Template
ENTER
IQ
SELECT
-
IQ 2 0 0 0
+
HOT WATER