Netgear M5300-28G-POE+ (GSM7228PSv1h2) - 12-Port Managed Gigabit Switch Ratgeber Für Administratoren
Computer 1
Computer 3
Computer 2
Switch 1
Switch 2
Switch 3
IPv4 switch
IPv4 domain
IPv6 island
IPv6 island
IPv6 domain
1/0/3
1/0/1
2/0/1
2/0/3
2/0/24
2/0/1
Tunnels for IPv6
567
Managed Switches
Figure 57. 6to4 tunnel configuration
Note:
The following examples do not include the configuration of the IPv4
switch because the 6to4
switch because the 6to4
configuration occurs only in the IPv6 island.
The switch in IPv4 domain does not require any special configuration.
CLI: C
reate a 6to4 Tunnel
You must configure Switch1, Switch2, and Switch 3.
CLI: Create a 6to4 Tunnel on Switch 1
1.
Enable routing and IPv6 routing on Switch 1.
(Netgear Switch) # config
(Netgear Switch) (Config)#ipv6 unicast-routing
(Netgear Switch) (Config)#ip routing
2.
Configure IPv4 address on routing port 1/0/1.
(Netgear Switch) (Config)#interface 1/0/1
(Netgear Switch) (Interface 1/0/1)#routing
(Netgear Switch) (Interface 1/0/1)#ip address 195.1.3.2 255.255.255.0
(Netgear Switch) (Interface 1/0/1)#exit