Netgear M5300-28G-POE+ (GSM7228PSv1h2) - 12-Port Managed Gigabit Switch Ratgeber Für Administratoren

Seite von 721
Tunnels for IPv6 
572
Managed Switches 
Web Interface: C
reate a 6to4 Tunnel
You must configure Switch1, Switch2, and Switch 3.
Web Interface: Create a 6to4 Tunnel on Switch 1
1. 
Enable IP routing on Switch 1.
a. Select Routing > IP > Basic > IP Configuration
A screen similar to the following displays.
b.  For Routing Mode, select the Enable radio button.
c.  Click Apply.
2. 
Enable IPv6 forwarding and unicast routing on Switch 1.
a. Select Routing > IPv6 > Basic> Global Configuration
A screen similar to the following displays.
b.  For IPv6 Unicast Routing, select the Enable radio button.
c.  Click Apply.
3. 
Create a routing interface and assign an IP address to it.