Netgear M5300-28G-POE+ (GSM7228PSv1h2) - 12-Port Managed Gigabit Switch Hardwarehandbuch

Seite von 32
Hardware Installation
18
NETGEAR Managed Stackable Switch M5300 Series 
For information about working with the CLI, see the Command Line Interface Reference for 
the ProSafe M5300 Series Stackable Switches
 on the Resource CD that shipped with your 
product.
Power Module Bay
The power module bay provides an easy way to replace a failed power module APS135W or 
APS525W. If the switch must continue to operate while you replace the power supply, 
another APS135 or APS525 must be installed in the second power supply bay on the switch 
rear panel.
Install a Power Module
To install a power module:
WARNING:
When inserting a power module into the switch, do not use 
unnecessary force. Doing so can damage the connectors on the 
rear of the supply and on the midplane.
1. 
Insert the new power supply module into the power module slot, and gently push the 
module into the slot.
RPS C
onnec
tor
2. 
Align the two captive screws with the screw holes in the switch rear panel.
3. 
Using a screwdriver, gently tighten the captive screws.
4. 
Connect the power cord to the module and to an AC-powered outlet.
Remove a Power Module
To remove a power module:
1. 
Disconnect the power cord from the power module.
2. 
Remove the power cord from the power connector.