Middleby Marshall P/N 60250 Benutzerhandbuch

Seite von 36
IV
P/N 60250 September 28, 2012
NOTE
Wiring Diagrams are in Section 5 of this Manual. 
The diagram for each oven is also on the lower 
inner surface of its Control Console.  
Page
SECTION 1 – DESCRIPTION  ............................................ 1
  I.   OVEN USES ............................................................. 1
  II.   OVEN COMPONENTS ............................................. 1
   
 
A.  Conveyor Motor Drive ................................... 1
   
 
B.  Crumb Pans .................................................. 1
   
 
C.   Conveyor ....................................................... 1
   
 
D.  End Plugs ...................................................... 1
   
 
E.  Eyebrows ....................................................... 1
   
 
F.  Window .......................................................... 1
   
 
G.  Machinery Compartment Access Panel ........ 1
   
 
H.  Serial Plate .................................................... 1
   
 
I.   Control Panel ................................................. 1
   
 
J.  Photo Cell ...................................................... 1
   
 
K.  Gas Burner .................................................... 1
   
 
L.  Blowers .......................................................... 1
     M. 
 .......................................................Air Fingers 
1
  III.  OVEN SPECIFICATIONS ......................................... 2
   
 
A.  Dimensions .................................................... 2
   
 
B.  General Specifications .................................. 2
   
 
C.  Electrical Specifications for  
   
 
  PS740 Gas Ovens ......................................... 2
   
 
D.  Gas Orifice and Pressure Specifications  
   
 
  for PS740 Gas Ovens ................................... 2
SECTION 2 – INSTALLATION  .......................................... 3
  I.   BASE PAD KIT ......................................................... 4
  II.   INSTALLATION KIT .................................................. 6
  III.  VENTILATION SYSTEM ........................................ 12
   
 
A.  Requirements .............................................. 12
   
 
B.  Recommendations ...................................... 12
   
 
C.  Other Ventilation Concerns ......................... 12
  IV.  ASSEMBLY ............................................................ 13
   
 
A.  Base Pad, Legs, Casters ............................. 13
   
 
B. Stacking ....................................................... 14
   
 
C.  Restraint Cable Installation ......................... 14
   
 
D.  Conveyor Installation ................................... 15
   
 
E.  Standoff Installation ..................................... 15
  V.   FINAL ASSEMBLY ................................................. 16
  VI.  ELECTRICAL SUPPLY .......................................... 16
     Connection ....................................................... 17
  VII.  
GAS SUPPLY ................................................... 17
   
 
A.  Gas Utility Rough-In Recommendations ..... 17
   
 
B.  Connection .................................................. 18
   
 
C.  Gas Conversion ........................................... 18
   
 
D.  Propane Conversion .................................... 18 
     E.  Adjusting the Maximum Pressure Setting ... 18 
   
 
F.  Adjusting the Minimum Pressure Setting .... 19 
   
 
G. Checkout ..................................................... 19 
   
 
H. Maintenance ................................................ 19
Page
SECTION 3 – OPERATION  ............................................. 20
  I.   LOCATION AND DESCRIPTION OF CONTROLS  20
  II. NORMAL OPERATION, STEP-BY-STEP ................ 21
   
 
A.  Main Screen ................................................ 21
   
 
B.  Daily Startup Procedure .............................. 21
   
 
C.  Daily Shutdown Procedure .......................... 21
  III.  QUICK REFERENCE: TROUBLESHOOTING ....... 22
  IV.  SCREEN ALERTS .................................................. 22
SECTION 4 – MAINTENANCE  ........................................ 23
  I.   MAINTENANCE – DAILY ....................................... 23
  II.   MAINTENANCE – MONTHLY ................................ 24
  III.  MAINTENANCE – EVERY 3 MONTHS .................. 25
  IV.  MAINTENANCE – EVERY 6 MONTHS .................  26
  V.   KEY SPARE PARTS KIT ........................................ 27
SECTION 5 – ELECTRICAL WIRING DIAGRAM ............ 28
  I.   WIRING DIAGRAM, 740 GAS OVEN, 208/240V,  
       50/60 Hz, 1 Ph ........................................................ 28
TABLE OF CONTENTS