Philips 862478 User Manual
Recommendations for Maintenance Frequency
3-4
Maintaining the Monitor
Recommendations for Maintenance Frequency
The following table is the recommended maintenance schedule for your C3 monitor. The
maintenance checklist appears in the next section of this chapter. The checklist may be
photocopied and should be completed by the maintainer. It should be filed for future
reference. The owner of the equipment is responsible for the performance of the maintenance
activities with the schedule below.
maintenance checklist appears in the next section of this chapter. The checklist may be
photocopied and should be completed by the maintainer. It should be filed for future
reference. The owner of the equipment is responsible for the performance of the maintenance
activities with the schedule below.
Maintenance
Frequency
Procedure
Inspect the monitor, cables
and cords
and cords
Daily
Cleaning
As needed
Safety checks according to
IEC 60601-1
IEC 60601-1
At least once every 2 years,
after any repairs, if the
monitor has been dropped
or as needed.
after any repairs, if the
monitor has been dropped
or as needed.
Functional testing
procedures
procedures
When functional defects in
the measurements are
suspected.
the measurements are
suspected.
Performance Assurance
At least once every year, or
as needed (if you suspect
defects in the
measurements).
as needed (if you suspect
defects in the
measurements).
Replace backlight
20,000 hours (about 4
years) of continuous use, or
as needed.
years) of continuous use, or
as needed.
NBP Maintenance
Every year, or as needed, if
the monitor has been
opened, or you suspect
defects in the measurement.
the monitor has been
opened, or you suspect
defects in the measurement.
Battery Maintenance
Every two years
Battery Conditioning
Approximately every 200
deep discharges.
deep discharges.