Honeywell MRP-2001 User Manual
Template 9: Dual Hazard - Combined Release
FACP Configuration Templates
MRP-2001 & MRP-2001E PN 53040:A 4/16/2007
111
B.3 Template 9: Dual Hazard - Combined Release
Table Legend:
X = direct correlation between Input Zone and Output Circuit (input zone activation will turn on corresponding
output circuit).
output circuit).
Input Zone Types:
•
Zone 1 = 2-wire smoke
•
Zone 2 = Fire
•
Zone 3 = Waterflow - activation delayed for 10 seconds (Waterflow Delay set to 10 secs.)
•
Zone 4 = Manual Release
•
Zone 5 = Pull Station
•
Zone 6 = Supervisory
Output Circuit Types:
•
Output 1 = Alarm NAC
•
Output 2 = Supervisory Bell NAC
•
Output 3 = Release Solenoid 1 (unsupervised for shorts)
•
Output 4 = Release Solenoid 2 (unsupervised for shorts)
Timers
•
Soak Timer 1 - set for 10 minutes
•
Soak Timer 2 - set for 10 minutes
•
Waterflow Delay Timer - set for 10 seconds
•
AC Loss Delay Timer - set for 2 hours
Operation
•
Activation of Input Zone 1 (2-Wire Smoke) or Zone 2 (Fire) or Zone 4 (Manual Release) or
Zone 5 (Pull Station) will operate the Alarm NAC Output #1, Release Solenoid 1 Output #3
and Release Solenoid 2 Output #4. Release Solenoid 1 will turn off water release following
time-out of the 10 minute Soak Timer 1 and Release Solenoid 2 will turn off water release
following time-out of the 10 minute Soak Timer 2
Zone 5 (Pull Station) will operate the Alarm NAC Output #1, Release Solenoid 1 Output #3
and Release Solenoid 2 Output #4. Release Solenoid 1 will turn off water release following
time-out of the 10 minute Soak Timer 1 and Release Solenoid 2 will turn off water release
following time-out of the 10 minute Soak Timer 2
•
Activation of Input Zone 3 (Waterflow) will operate the Alarm NAC Output #1. There is a
10 second FACP initiated delay in activation since Waterflow Delay Timer is set to 10
seconds
10 second FACP initiated delay in activation since Waterflow Delay Timer is set to 10
seconds
•
Activation of Input Zone 6 (Supervisory) will operate the Supervisory Bell NAC Output #2
FACP Relay Operation
The following description of FACP relay operations are in addition to normal system operation.
•
Alarm Relay - activation of Input Zone 1 (2-Wire Smoke) or Zone 2 (Fire) or Zone 3
(Waterflow - with Waterflow Delay time) or Zone 4 (Manual Release) or Zone 5 (Pull
Station) will operate Alarm Relay
(Waterflow - with Waterflow Delay time) or Zone 4 (Manual Release) or Zone 5 (Pull
Station) will operate Alarm Relay
•
Trouble Relay - any system trouble will activate the Trouble Relay
•
Supervisory - activation of Zone 6 (Supervisory) will operate the Supervisory Relay
TEMPLATE 9: DUAL HAZARD - COMBINED RELEASE
INPUT ZONES
1
2
3
4
5
6
OUTPUT CIRCUITS
2-WIRE SMOKE
FIRE
WATERFLOW
MANUAL
RELEASE
PULL
STATION
SUPV.
#1 ALARM NAC
X
X
X
X
X
#2 SUPV BELL NAC
X
#3 RELEASE SOLENOID 1
X
X
X
X
#4 RELEASE SOLENOID 2
X
X
X
X