Sterling 882.00294.00 User Manual

Page of 63
Replacement Procedures 
1. Shut down the dryer, tag out and lock out the controls if necessary. 
2. Shut the water off to the cooling coil. 
3. Remove the four 10-32 bolts. 
4. Gently slide the cooling coil out. 
5. Visually inspect the coil for leaks, dirt, and ant sign of volatiles. 
6. Blow the dust out, or if the coil is covered with plasticizer, steam clean it. 
7. Place the coil back in its housing. Make sure the gasket is OK, replace if necessary. 
8. Inset the four 10-32 bolts back in place. 
9. Turn the water to the cooling coil back on. 
Portable Drying/Conveying Systems 
Chapter 5:  Maintenance 
47 of 63