Monte Carlo Fan Company 5EG60XX Series User Manual

Page of 5
Installation work and electrical wiring must be done by qualified person(s) in accordance with applicable codes and standards (ANSI/NFPA 70-
1999), including fire-rated construction.
Use this unit only in the manner intended by the manufacturer.  If you have  any questions contact the manufacturer.
After making the wire connections, the wires should be spread apart with the grounded conductor and the equipment-grounding conductor on
one side of the outlet box and ungrounded conductor on the other side of the outlet box.
Before you begin installing the fan, Switch power off at Service panel and lock service disconnecting means to prevent power from being
switched on accidentally. When the service disconnecting means cannot be locked, securely fasten a prominent warning device, such as a tag,
to the service panel.
Be cautious! read all instructions and safety information before installing your new fan. Review the accompanying assembly diagrams.
When cutting or drilling into wall or ceiling, do not damage electrical wiring and other hidden utilities.
Make sure the installation site you choose allows the fan blades to rotate without any obstructions. Allow a minimum clearance of 7 feet from
the floor to the trailing edge of the blade.
WARNING – Risk of fire, electric shock, or personal injury, The fan in this box may be either directly supported from a structural framing member of
a building and/or may be mounted to an outlet box marked acceptable for fan support of 31.8 kg. (70 lbs.) or less. Most outlet boxes .
Attach the
mounting bracket using only the hardware supplied with the outlet box.
To reduce the risk of fire or electric shock, do not use this fan with any solid state fan speed control device, or variable speed control.
If this unit is to be installed over a tub or shower, it must be marked as appropriate for the application.
NEVER place a switch where it can be reached from a tub or shower.
The combustion airflow needed for safe operation of fuel-burning equipment may be affected by this unit’s operation. Follow the heating equip-
ment manufacturer’s guideline safety standards such as those published by the National Fire Protection Association (NFPA), and the American
Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) and the local code authorities.
Before servicing or cleaning unit, Switch power off at Service panel and lock service disconnecting means to prevent power from being switched
on accidentally.  
When the service disconnecting means cannot be locked, securely fasten a prominent warning device, such as a tag, to the service panel.
Before servicing or cleaning unit, Switch power off at Service panel and lock service disconnecting means to prevent power from being switched
on accidentally.  When the service disconnecting means cannot be locked, securely fasten a prominent warning device, such as a tag, to the
service panel.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15
Installation
WARNING: TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS,
OBSERVE THE FOLLOWING: READ AND SAVE THESE INSTRUCTIONS
S
AFETY
T
IPS
TOOLS REQUIRED
Phillips Screwdriver      Wire Cutters       Pliers      Step Ladder
Before you begin installing the fan, Switch power off
at Service panel and lock service disconnecting means
to prevent power from being switched on accidentally.
When the service disconnecting means cannot be
locked, securely fasten a prominent warning device,
such  as a tag, to the service panel.
1
Before installing this fan make sure the outlet
box is properly installed to the house structure.
To reduce the risk of fire, electric shock, or per-
sonal injury, mount to outlet box or supporting
system acceptable for fan support. 
(Mounting must support at least 70 lbs.)
2
Remove 1 screws opposite each
other and loosen 3 remaining
screws. Save removed screws for
use later.
6
For Canadian installation and for USA fan and
light kit combinations over 35 lbs, in both flush
and downrod mode the safety cable must be
installed into the house structure beams using
the 3” lag screws provided.  Make sure that
when the safety cable is fully extended the
leadwires are longer than the cable and no
stress is placed on the leadwires.
4
Safety cable installation
Safety Cable
Lag Screw
Lag Screw
Safety Cable
Washer
Lock Washer
Thread safety cable through center
hole of the mounting plate. Thread
your house wires through center hole
also.These will be needed for wiring
of the fan.
3
Secure mounting plate directly to a joist from
the buliding structure via the two knock out
holes on the outlet box. Use only the appropri-
ate wood screws and washers included with
your fan. Caution: Wood screws must go
through the safety cable,hanging plate,outlet
box and into the building joist.
Outlet box
Mounting
Plate
Wood
Screws
BUILDING STRUCTURE METHOD
5