United States Stove 6100 User Manual

Page of 24
USSC
9
Installation
VENT TERMINATION CLEARANCES:
A -----
Minimum 4-foot clearance below or beside any door or window that opens.
B -----
Minimum 1-foot clearance above any door or window that opens.
C -----
Minimum 3-foot clearance from any adjacent building.
D -----
Minimum 7-foot clearance from any grade when adjacent to public walkways.
E -----
Minimum 2-foot clearance above any grass, plants, or other combustible materials.
F -----
Minimum 3-foot clearance from a forced air intake of any appliance.
G -----
Minimum 2-foot clearance below eaves or overhang.
H -----
Minimum 1-foot clearance horizontally from combustible wall.
I ------
Must be a minimum of 36-inches above the roof and 24-inches above the highest point of the roof within 10-feet.
VENT TERMINATION CLEARANCES