Windsor MPRO 10080390 User Manual

Page of 48
OPERATION 
86037780  EXTRACTOR  05/09/08 
                       
3-3 
OPERATING INSTRUCTIONS 
 
FILLING THE SOLUTION TANK 
 
 
1.  Release dome clamp. 
 
 
2.  Lift upper recovery tank from machine and  
 set 
aside. 
 
3.  Use a clean bucket, recovery tank or hose to 
fill solution tank with hot water.  The solution 
tank holds 4 gallons (15.2 liters) of cleaning 
solution. 
 
 
4.  Add a non-foaming concentrate for use in 
hot water extractors at the proportions noted 
on the container. 
 
NOTE: Periodically operate the extractor with only 
hot water to remove chemical residue in carpet. 
 
To avoid possible distortion of the polyethylene 
solution/recovery tanks, DO NOT USE WATER 
WITH A TEMPERATURE THAT EXCEEDS 140°F 
(60°C). 
 
 
5.  Place recovery tank back on machine. 
 
 
6.  Place dome on recovery tank.  Make sure 
dome is seated correctly to ensure proper 
vacuum seal.  Clamp dome securely to 
recovery tank. 
 
Use only the suitable chemicals listed in the 
Chemical Section.  Using incompatible 
chemicals will damage the machine.  Carefully 
read ingredients on manufacturer’s label before 
using any product in this machine.
  
 
 
 
SPECIAL NOTES: 
 
This appliance is not intended for use by persons 
(including children) with reduced physical, sensory 
or mental capabilities, or lack of experience and 
knowledge, unless they have been given supervision 
or instruction concerning use of the appliance by a 
person responsible for their safety. Children should 
be supervised to ensure that they do not play with 
the appliance. 
 
The sound pressure level at the operator’s ear was 
measured to be 73.7 dBA.  This was a nearfield, 
broad-band measurement taken in a typical 
industrial environment on a tile floor.  This appliance 
contains no possible source of impact noise.  The 
instantaneous sound pressure level is below 63 Pa. 
 
The weighted root mean square acceleration at the 
operator’s arms was measured to be below 2.5m/s
2
This was a tri-axial, third-octave-band measurement 
made during normal operation on a composite tile 
floor.  The measurement and related calculations 
were made in accordance with ISO 5349-1.