Step 7
Guide  the  vent  terminations  4”  and  7”  collard  into  their 
respective vent pipes. Double check that the vent pipes 
overlap  the  collars  by  ”  (51  mm).  Secure  the  termina-
tion  to  the  wall  with  screws  provided  and  caulk  around 
the wall plate to weatherproof. As an alternative to screw-
ing the termination directly to the wall, you may also use 
expanding plugs or an approved exterior construction ad-
hesive. You may also attach the termination with screws 
through the inner body into the 4” vent pipe, however for 
this method, you must extend the 4” pipe approximately 
6” (15 mm) beyond the outer face of the wall.
Support horizontal pipes every 36” (914 
mm) with metal pipe straps.
VeRtICAl SIDeWAll INStAllAtIoN - 
Flex VeNt PIPe
 
Note: The 40” (1016 mm) flex vent is used for 90° off the 
top of the unit then out the back wall.
Follow Step 1 and  on Page 19.
Step 3
Install the four (4) spacer springs on the 4” flex vent pipe. 
When  installing  the  spacer  springs    around  the  4”  pipe, 
stretch  the  spring  to  approximately  15”  (381  mm),  wrap 
the spring around the pipe and interlock the ends of the 
spacer  spring  approximately  ”  (51  mm).  Measure  6C\v” 
(17 mm) from the end of the pipe. Place the next spring 
5”  (17  mm)  from  the  previously  installed  spring.  Place 
the next spring 6” (15 mm) from the last spring. Finally 
place  the  last  spring  1”  (305  mm)  from  the  last  spring 
installed. Figure 31
Step 4
Install the 4” (10 mm) flex vent pipe to the appliance col-
lar as described on Page 14. Secure the end with the first 
spring 6C\v” (17 mm) from the flex pipe end to the unit.
Step 5
Slide the 7” (178 mm) flex vent pipe over the 4” flex vent 
pipe and secure the 7” collar as described on Page 13.
Step 6
Bend the flex pipe horizontal so the bottom of the horizon-
tal pipe measure 6Z\x” (165 mm) from the top of the unit 
immediately after the 90° formation. Figure 32. Be sure to 
follow the 1/” (13 mm) rise in a 1” (305 mm) horizontal 
run rule.
Step 7
Install the 4” flex then 7” flex to the termination.
12"
(305mm)
6"
(152mm)
5"
(127mm)
66M"
(172mm)
FP1474
spacer springs
4/04  djt
4” Flex Vent Pipe
Spacer Spring
FP1474
Figure 31 - 
Install Spacer Springs
656O" (165mm)
FP1475
flex 90 bend
4/04  djt
Figure 32 -
 
Bend flex vent at 90° so horizontal por-
tion is 6
Z\x”  (165 mm) off top of unit
FP1475