vENTING INSTaLLaTIoN 
INSTaLLaTIoN PLaNNING 
There are two basic types of direct-vent installation:
 
  Horizontal Termination
 
  Vertical Termination
It is important to select the proper length of vent pipe for the type of termination you choose. It is also 
important to note the wall thickness. 
FoR hoRIZoNTaL TERMINaTIoN
Select the amount of vertical rise desired. All horizontal run of venting must have 1/4" rise for every 12" 
of run towards the termination. 
You may use up to three 90° elbows in this vent configuration. Refer to Horizontal Termination Configu-
rations
 on Pages 22 and 23.
FoR vERTICaL TERMINaTIoN
Measure the distance from the fireplace floor to the ceiling. Add the ceiling thickness, the vertical rise in 
an attic or second story, and allow for sufficient vent height above the roof line. 
NoTE: You may use two 45° elbows in place of a 90° elbow. You must follow rise to run ratios when 
using 45° elbows. The appliance is approved for use with three 90° elbows maximum or a combination 
of  90° and 45° elbows up to a maximum of 270°. 
For two-story applications, firestops are required at each floor level. If an offset is needed in the attic, 
additional pipe and elbows will be required.
You may use a chase with a vent termination with exposed pipe on the exterior of the house. Refer to 
Installing Vent System in a Chase below. If pipe is enclosed in chase, it is not exposed. 
It is very important that the venting system maintain its balance between the combustion air intake and 
the flue gas exhaust. Certain limitations apply to vent configurations and must be strictly followed.
INSTaLLING a vENT SySTEM IN aN ouTSIdE ChaSE
A chase is a vertical boxlike structure built to enclose venting that runs along the outside of a building. 
A chase is required for such venting. 
w
a
RNING
Never  run  the  vent  pipe  down.  This  may 
cause excessive temperatures which could 
cause a fire.
Treatment of firestops and construction of 
the  chase  may  vary  from  building  type  to 
building  type.  These  instructions  are  not 
substitutes  for  the  requirements  of  local 
building  codes.  you  must  follow  all  local 
building codes.
N
o
TICE
when  installing  in  a  chase,  you  should 
insulate the chase as you would the outside 
walls  of  your  home.  This  is  especially 
important  in  cold  climates.  Insulation 
should  be  considered  a  combustible 
material. Maintain proper clearances to all 
combustible materials.
always maintain minimum clearances around vent systems. The minimum clearances 
to combustibles for horizontal vent pipe are 3" at the top and 1" at the sides and bottom 
of the vent system until the pipe penetrates the nearest vertical wall. a 1" minimum 
clearance all around the pipe must be maintained. do not pack the open air spaces with 
insulation or other materials. This could cause high temperatures and may present a 
fire hazard.
w
a
RNING
w
a
RNING