Monessen Hearth PL20 User Manual

Page of 32
90D0093
11
Parlor Vent Free Fireplace
FIREPLACE INSTALLATION
If unit is to be “built in”, fireplace framing can be built before or after the appliance is set in place. 
BE SURE THAT ALL PACkING MATERIAL HAS BEEN REMOVED FROM THE UNDERSIDE 
OF THE UNIT PRIOR TO SETTING THE FIREBOX IN PLACE. 
Construct fireplace framing 
following Figure 2 on Page 6. The framing headers may rest directly on top of the firebox.
The fireplace may be installed directly on a combustible floor or a raised platform of an appro-
priate height. Do not place fireplace on carpeting, vinyl, tile or other soft floor coverings. It may, 
however, be placed on flat wood, plywood, particle board or other hard surfaces. Be sure fire-
place rests on a solid continuous floor or platform with appropriate framing for support and so 
that no cold air can enter from under the firebox.
Anchor fireplace to the side framing members using nailing flanges.
W
ARNING
The  fireplace  must  be  installed  giving  full 
consideration to the clearance and height 
requirements identified in this manual.
1.  Secure nailing flanges to side of firebox. Figure 7
.  Slide  the  firebox  into  prepared  framing  or  position  firebox  in  its  final  position  and  frame 
later.
3.  Level the firebox by checking the top edge of the firebox. Shim if necessary.
4.  Anchor firebox to the side framing members using 8d nails or other suitable fasteners. Figure 
8
FP2559
nailing flange
Nail Sides 
Through 
Nailing 
Flanges
FP559
Figure 8 - 
Nailing Flanges
FP2558
nailing flanges
5/8" Spacing
1/" Spacing
FP558
Figure 7 - 
Nailing Flanges