Monessen Hearth HBDV300 User Manual

Page of 54
54D5031 
7
B
A
D
F
H
A
E
C
1/2” or 5/8”
C
A
A
C
G
G
1/2” or 5/8”
1/2” or 5/8”
FIREPLACE FRAMING 
Firebox framing can be built before or after the appliance is set in place. Construct firebox framing following Figure 2 and 
the chart below for your specific installation requirements. See Figure 3 on Page 8 for firebox dimensions.  The framing 
headers may rest on the top of the firebox standoffs. Do not bring headers below top of standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropriate height. When the 
firebox is installed directly on carpeting, tile, or other combustible material, other than wood flooring, the firebox shall be 
installed on a metal or wood panel extending the full width and depth of the enclosure.
Corner Installation 
 Stud Location 
Inside Chase Installation 
Figure 2 - Framing Dimensions 
   
300 400 
 A 
33
1
/
2
" 37
1
/
2
"
 B 
37
1
/
4
" 40
7
/
8
"
 C 
28
1
/
4
" 29
1
/
4
"
 D 
14
1
/
8
" 13
1
/
2
"
 E 
55
11
/
16
" 60
7
/
8
"
 F 
27
13
/
16
" 30
7
/
16
"
 G 
13
3
/
4
" 16
1
/
2
"
 H 
 39
3
/
8
" 43
1
/
16
"
PRE-INSTALLATION INFORMATION  
Do not fi ll spaces around fi rebox with insulation or other materials. This could cause 
a fi re. 
W
ARNING