vENTING INSTaLLaTIoN 
INSTaLLaTIoN FoR vERTICaL TERMINaTIoN 
1.  Determine the route your vertical venting will take. If ceiling joist, 
roof rafters or other framing will obstruct the venting system, con-
sider an offset. Refer to Figure 32 to avoid cutting load bearing 
members. 
NoTE:  Pay  special  attention  to  these  installation  instructions  for 
required clearances (air space) to combustibles when passing through 
ceilings, walls, roofs, enclosures, attic rafters, etc. Do not pack air 
spaces with insulation. Also note maximum vertical rise of the venting 
system and any maximum horizontal offset limitations. Offsets must 
fall within the parameters shown on Page 20, Figure 22.
2.  Set fireplace in desired location. Drop a line plumb down from the 
ceiling to the position of the flue exit. Mark the center point where 
the vent will penetrate the ceiling. Drill a small locating hole a this 
point. 
  Drop a plumb line from the inside of the roof to the ceiling locat-
ing hole in the ceiling. Mark the center point where the vent will 
penetrate the roof. Drill a small locating hole at this point. 
FLaT CEILING INSTaLLaTIoN
1.  Cut a 9Z\x" (241 mm) square hole in the ceiling using the locating 
hole as a center point The opening should be framed to 9Z\x" x 9Z\x" 
(241 x 241 mm) inside dimensions as shown in Figure 33 using 
framing lumber the same size as the ceiling joist. If the area above 
the ceiling is an insulated ceiling or a room, nail firestop from the 
top side. This prevents loose insulation from falling into the required 
clearance space. Figure 33. Otherwise, install firestop below the 
framed hole.
2.  Assemble the desired lengths of pipe and elbows necessary to 
reach from the burner system flue up through the firestop. Be 
sure pipe and elbow connections are fully twist-locked. Page 
18, Figure 18
3.  Cut a hole in the roof using the locating hole as a center point. 
(Cover any exposed open vent pipes before cutting hole in 
roof). The 9Z\x" x 9Z\x" (241 x 241 mm) hole must be measured 
on the horizontal. Actual length may be larger depending on 
the pitch of the roof. There must be a 1" minimum clearance 
from the vent pipe to combustible materials. (Insulation should 
be considered a combustible material) Frame the opening as 
shown on Page 18, Figure 17.
Figure 34 - 
If area above is not a room, install firestop below 
framed hole as shown
 
Nails
Firestop 
FP1969
offset w/ wallstrap
Figure 32 - 
Offset with Wall Strap and 45° Elbows
 
Roof 
Flashing 
Wall Strap 
45° Elbows 
Ceiling Firstop 
FP1669
FP1969
firestop w room above
Figure 33 - 
If area above is a room, install firestop above 
framed hole as shown
 
Firestop 
Nails
FP1969
FP1970