Hearth & Home Technologies PIER-HVB-CE User Manual
Heat & Glo • PIER/ST/L&RCOR-HVB-CE • 2068-900 Rev. H • 6/07
18
Framing should be constructed
of 51mm x 102mm (2” x 4”)
lumber or heavier.
of 51mm x 102mm (2” x 4”)
lumber or heavier.
Model
A
B
C
D
E
PIER-HVB-CE
107 (42-1/8)
108 (42-1/2)
58 (23)
91 (35-3/4)
122 (48)
ST-HVB-CE
121 (47-5/8)
108 (42-1/2)
58 (23)
91 (35-3/4)
122 (48)
L&RCOR-HVB-CE
107 (42-1/8)
108 (42-1/2)
73 (28-3/4)
91 (35-3/4)
122 (48)
Figure 5.
Framing Dimensions
NOTE: DIMENSIONS SHOWN IN CENTIMETERS AND (INCHES).
Shows center of 254mm x 305mm (10”x12”) flue framing holes for top and rear flueing.
The center of the hole is 25.4mm (one inch) above the center of the horizontal flue pipe.
The center of the hole is 25.4mm (one inch) above the center of the horizontal flue pipe.
PIER-HVB-CE
ST-HVB-CE
L & R-COR-HVB-CE
A
C
B
D
B
C
A
A
C
B
E