Hearth & Home Technologies Pier-HVB-IPI User Manual

Page of 40
Heat & Glo  •  PIER-HVB-IPI, ST-HVB-IPI •  2006-901 Rev. C •  12/07
14
3
Installing the Fireplace
Step 1.  Locating the Fireplace
The diagram below shows space and clearance require-
ments for locating a fireplace within a room.
Figure 4A.    Fireplace Dimensions and Locations
Clearance Requirements
The top, back, and sides of the fireplace are defined by
stand-offs. The minimum clearance to a perpendicular wall
extending past the face of the fireplace is one inch (25 mm).
The metal ends of the fireplace may NOT be recessed into
combustible construction.
Note:  Refer to Figure 4B for dimensions and appliance
locations if installing a Pier-HVB unit with a Catalina
shelf and/or marble package
.
Note:  Refer to the Catalina installation instruction
included with kit for assembly and installation.
Figure 4B.
50-1/2 in.
34-1/2 in.
7 in.
47-1/2 in.
45-1/4 in.
13/16 in.
Marble sizes (inches):
Header .................................. 26 x 8
Side headers .................. 45-1/2 x 8
Legs ................................ 33-1/2 x 7
45 -1/4 in.
(1149mm)
FINISHED
WALL
Fireplace Locations/Dimensions with
Catalina Shelf/Marble Package ONLY
Note: This location diagram MUST be followed when in-
stalling a Pier-HVB with a Catalina shelf/marble package
since the fireplace is installed further from finished wall.
36"
GLASS
GLASS
36"
GLASS
GLASS
GLASS
36"
36"
PIER-HVB-IPI 
TOP VIEW
ST-HVB-IPI
TOP VIEW