Enviro EG40-070 User Manual

Page of 36
24
•  For  multi  story  installations.  A  ceiling  firestop  is 
required  at  the  second  floor,  and  any  subsequent 
floors (see Figure 33). The opening should be framed 
to 10” (25.4 cm) x 10” (25.4 cm) inside dimensions, 
in the same manner as shown in Figure 29.
•  Any  occupied  areas  above  the  first  floor,  including 
closets  and  storage  spaces,  which  the  vertical  vent 
passes  through,  must  be  enclosed.  The  enclosure 
may  be  framed  and  sheetrocked  with  standard 
building  materials.  However  consult  the  appliance 
manufactures  installation  instructions  for  the 
minimum  allowable  clearance  between  the  outside 
of  the  vent  pipe,  and  the  combustible  surfaces  of 
the enclosure. Do not fill any required air spaces with 
insulation.
Figure 33: Multi-Story Vent Pipe Installation.
C
ATHEDRAL
 C
EILING
 I
NSTALLATION
:
1. Follow installation steps 1 & 2 from I
NITIAL
 I
NSTALLATION
 - V
ERTICAL
 I
NSTALLATION
.
2. Using the plumb bob, mark the center line of the venting system on the ceiling and drill a small hole 
through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of 
the Cathedral Ceiling Support Box.
3. Remove shingles or other roof coverings as necessary to cut the rectangular hole for the Support Box. 
Cut the hole 1⁄8” larger than the Support Box outline.
4. Lower the Support Box through the hole in the roof until the bottom of the Support Box protrudes at 
least 2 inches (5 cm) below the ceiling. Align the Support Box both vertically and horizontally with a 
level as shown in Figure 34. Temporarily tack the Support Box in the place through the inside walls 
and into the roof sheathing.
Figure 34: Cathedral Ceiling Support Box 
Leveling.
Figure 35: Cathedral Ceiling Support 
Box Installation.
5. Using tin snips, cut the Support Box from the top corners 
down  to  the  roof  line,  and  fold  the  resulting  flaps  over 
the roof sheathing (Figure 35). Before nailing it in to the 
roof, run a bead of non-hardening mastic around the top 
edges of the Support Box to make a seal between the box 
and  the  roof.  Clean  out  any  combustible  material  from 
Initial Installation
QUALIFIED INSTALLERS ONLY
the  inside  of  the 
Support Box.
6. Complete 
the 
cathedral 
ceiling 
installation 
by 
following 
the 
same  procedures 
outlined  in  Steps 
4  through  9  from 
I
NITIAL
  I
NSTALLATION
  - 
V
ERTICAL
 I
NSTALLATION
.