Enviro C-10794 User Manual

Page of 45
STEP 3.  To  install  the  Round  Support  Box/Wall 
Thimble in a flat ceiling, cut a 10” square 
hole  in  the  ceiling,  centered  in  the  hole 
drilled in Step 2. Frame the hole as shown 
in Figure 23.
STEP 4.  Assemble the desired lengths of black pipe 
and elbows necessary to reach from the 
appliance adapter up through the Round 
Support  Box.  Insure  that  all  pipe  and 
elbow connections are in their fully twist-
locked position.
STEP 5.  Cut hole in the roof centered on the small 
hole placed in the roof from Step 2. The 
hole should be of sufficient size to meet 
minimum  requirements  for  Clearance 
to  Combustibles,  as  specified.  Continue 
to  assemble  lengths  of  pipe  and  elbows 
Figure 23: Wall Framing for Hole for Vertical 
Installation. 
necessary  to  reach  from 
the  ceiling  support  box 
up  through  the  roof  line. 
Galvanized 
pipe 
and 
elbows  may  be  utilized 
in  the  attic,  as  well  as 
above  the  roof  line. 
The  galvanized  finish  is 
desirable  above  the  roof 
line,  due  to  the  higher 
corrosion resistance.
STEP 6.  Once  the  pipe  sections 
have  been  joined,  and 
run  up  through  the  hole 
in the roof, slip an elbow 
strap  over  the  exposed 
sections, 
bend 
the 
support  straps  outwards, 
and push the elbow strap 
Initial Installation
QUALIFIED INSTALLERS ONLY
V
ERTICAL
 I
NSTALLATION
:
STEP 1.  Check  the  instructions  for  required  clearances  (air  spaces)  to  combustibles  when  passing 
through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. 
Do not pack air spaces with insulation.
STEP  2.  Set  the  gas  appliance  in  the  desired  location.  Drop  a  plumb  bob  down  from  the  ceiling  to 
the position of the appliance flue exit, and mark the location where the vent will penetrate 
the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole 
previously drilled in the ceiling, mark the spot where the vent will penetrate the roof. Determine 
if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to 
relocate the appliance, or to offset, to avoid cutting load bearing members.
Vertical
Termination
Storm Collar
Flashing
Roofing nails
Elbow Strap
Figure 24: Vertical Vent Termination Installation.
19