Enviro C-10794 User Manual

Page of 45
Figure 28: Cathedral Ceiling Support Box Leveling.
Figure 29: Cathedral Ceiling Support Box 
Installation.
STEP 6. Complete the cathedral ceiling installation 
by following the same procedures outlined 
in Steps 4 through 9 for I
NITIAL
 I
NSTALLATION
 
- V
ERTICAL
 I
NSTALLATION
.
F
REESTANDING
 D
IRECT
 V
ENT
 K
IT
 W
ITH
 C
OUPLER
:
KIT COMPONENTS:
Quantity
Description
Quantity
Description
1
Horizontal direct vent termination cap
1
Ø65⁄8” (17 cm) 90° elbow
2
Flue collar adapters (only one used)
4
Wire spacers
4
T-20 Torx screws
3
Decorative rings
1
Wall thimble
1
4 oz tube RTV silicone
1
Inside finish trim collar
20
9/16” tech screws
8
11⁄2” wood screws
1
Vinyl siding deflector
1
5’  (190 cm) length of Ø4” (10 cm) 
double walled flex pipe
2
24” (61 cm) section of Ø65⁄8” 
(17 cm) straight pipe
Please  ensure  that  all  components  are  supplied  with  this  kit.  If  components  are  missing  or  have 
been damaged, contact your dealer, distributor, or courier company. Do not attempt the installation if 
components are missing or damaged.
INSTALLATION INSTRUCTIONS:
1.  Decide on a location for the unit that will meet any or all local code requirements. Refer “Planning 
Your Installation” and “Clearances to Combustibles”.
2.  Set the appliance in the desired location. Determine if any wall studs, electrical wiring, or plumbing 
pipes are in the way of the venting system as it passes through the wall. If obstructions are found in 
the wall it may be necessary to adjust the location of the appliance.
22
Initial Installation
QUALIFIED INSTALLERS ONLY