Check after Installation and Operation Test 
 
Check after Installation
 
 
Items to be checked 
 
 
Possible malfunction 
Has the unit been fixed firmly? 
The unit may drop, shake or emit noise 
Have you done the refrigerant leakage test? 
It may cause insufficient cooling (heating) 
Is thermal insulation sufficient? 
It may cause condensation 
Is water drainage satisfactory? 
It may cause water leakage 
Is the voltage in accordance with the rated voltage 
marked on the nameplate? 
It may cause electric malfunction or damage the unit 
Is the electric wiring or piping connection installed 
correctly and securely? 
It may cause electric malfunction or damage the 
parts 
Has the unit been securely earthed? 
It may cause electrical leakage 
Is the power cord according to specification? 
It may cause electric malfunction or damage the 
parts 
Is the inlet or outlet blocked? 
It may cause insufficient cooling (heating) 
Is the length of connection pipes and refrigerant 
capacity according to important notice (page 18)? 
The refrigerant capacity is not accurate 
 
 
Operation Test
 
 
Before operation test: 
(1) 
Do not switch on power before installation is finished completely. 
(2)
 Electric wiring must be connected correctly and securely. 
(3)
 Cut-off valves of the connection pipes should be opened. 
 
Operation Test Method: 
(1) 
Switch on power and press "ON/OFF" button on the remote controller to start the operation. 
(2) 
Press MODE button to select the COOL, HEAT, FAN to check whether the operation is normal or not.