Unit Inspection
When the unit is delivered, verify that it is the correct unit and that it is properly 
equipped. Compare the information which appears on the unit nameplate with the 
ordering and submittal information. 
Inspect all exterior components for visible damage. Report any apparent damage or 
material shortage to the carrier and make a “unit damage” notation on the carrier’s 
delivery receipt. Specify the extent and type of damage found and notify the appropri-
ate Trane Sales Office. Do not proceed with installation of a damaged unit without 
sales office approval.
Inspection Checklist
To protect against loss due to damage incurred in transit, complete the following 
checklist upon receipt of the unit.
Inspect the individual pieces of the shipment before accepting the unit. Check for 
obvious damage to the unit or packing material.
Inspect the unit for concealed damage as soon as possible after delivery and 
before it is stored. Concealed damage must be reported within 15 days.
If concealed damage is discovered, stop unpacking the shipment. Do not remove 
damaged material from the receiving location. Take photos of the damage, if pos-
sible. The owner must provide reasonable evidence that the damage did not 
occur after delivery.
Notify the carrier’s terminal of the damage immediately, by phone and by mail. 
Request an immediate, joint inspection of the damage with the carrier and the 
consignee.
Notify the Trane sales representative and arrange for repair. Do not repair the unit, 
however, until damage is inspected by the carrier’s representative.
Loose Parts Inventory
Check all the accessories and loose parts which are shipped with the unit against the 
shipping list. Included in these items will be water vessel drain plugs, rigging and 
electrical diagrams, and service literature, which are placed inside the control panel 
and/or starter panel for shipment.
Unit Description
The 140 - 500 ton Model RTAC units are helical-rotary type, air-cooled liquid chillers 
designed for installation outdoors. The compressor circuits are completely assem-
bled, hermetic packages that are factory-piped, wired, leak-tested, dehydrated, and 
tested for proper control operation before shipment.
NOTE:
Packaged units are factory charged with refrigerant and oil.
 shows a typical RTAC packaged unit and its components.
 through 
 contain general RTAC mechanical specifications for all unit 
sizes.