FORM 115.20-NOM2 (105)
RECEIVING
Material  in  this  shipment  has  been  inspected  at  the 
factory  and  released  to  the  transportation  agency  in 
good condition. When received, a visual inspection of 
all cartons should be made immediately. Any evidence 
of rough handling or apparent damage should be noted 
on the delivery receipt and the material inspected in the 
presence of the carrier's representative.
If damage is found, a claim should be 
filed against the carrier immediately.
STORAGE
If the equipment is not to be immediately installed, store 
it in a dry location with the motor protected against 
moisture, dust, corrosion and physical damage.
PREPARE CEILING FOR MOUNTING
Depending  upon  building  construction,  provisions 
for mounting the unit must be made by the contractor 
according to architects; drawings.
It is important to ensure that the fan coils are securely 
mounted and the structure is sufficient to support the 
weight of the equipment. All anchors for mounting the 
equipment must be placed and sized to ensure a safe 
and durable installation.
The YHBC, YPHBC, YRHBC, YHH, YHHS, YPHH, 
YHYB, and YPHYB units are designed for installation 
in a horizontal position above a dropped ceiling. The 
YCHBC  is  a  cabinet  unit  intended  for  horizontal 
exposed surface mounting.
Unit  must  not  be  operated  during 
building  construction  due  to  ex-
cessive airborne dust and debris. The 
units must not be operated under any 
circumstances without an air filter in 
place.
 WIRING
All wiring must comply with the local and national code 
requirements.  Units are provided with wiring diagrams 
and nameplate data to provide information required for 
necessary field wiring.
For power wiring a 4 x 4 electrical box is provided on 
the cabinet for connection of power supply and is located 
on the same side as piping.
On YHBC units, the box is shipped unattached, it is 
field attached to the unit in a location convenient to 
electrical entrance.
Any devices such as fan switches or 
thermostats that have been furnished 
by  the  factory  for  field  installation 
must  be  wired  in  strict  accordance 
with the wiring diagram that is sup-
plied with the unit. Failure to do so 
could result in damage or injury.
In free (non-ducted return air) return installations of 
YHBC, YHH, YHHS  and YHYB  units;  the  furred 
down area must be completely sealed (except return 
air grille) to ensure that all return air is pulled from 
the conditioned space and not from other areas of the 
building structure.
Access  must  be  provided  for  servicing  the  unit.  If 
this access is provided by a removable ceiling panel, 
ample space must be allowed for removal of the blower 
panel and to provide access to electrical and plumbing 