Installation
FILTERS
Two-inch “throwaway” filters are standard and factory 
installed in a filter rack located prior to the evaporator 
coil.  Any optional pre-filters ordered with the unit will 
be shipped inside the unit, but must be field installed.  
The unit can also be ordered with an extended cabinet 
and 95% efficient post-filters.  These post-filters are 
installed at the factory.
Pre-filters  must  always  be  installed  ahead  of  the 
evaporator coil.  Post and pre-filters must be kept clean 
and replaced with the same size and type as shipped with 
the unit.  Dirty filters will reduce the capacity of the unit 
and may result in frosted coils and safety shutdowns.  
Required filter sizes and quantities are shown in Table 
2-6.  The unit should never be operated for any length 
of time without the proper filters installed in the unit.
CONDENSATE DRAIN
Condensate Drain Piping
The eco 
2
 cooling coils are located in the units so that 
the supply air is drawn through them. This results in 
the condensate being subjected to negative (-) static 
pressure. Unless some means of pressure equalization is 
provided in the condensate drains, the air rushing back 
through the drainpipe will cause the condensate to build 
up in the base rails. As the unit continues to operate, the 
accumulated water will be carried with the air stream, 
overfilling the base rails causing possible water leaks 
into the supply duct and/or causing water damage in 
the building. A trap must be installed to prevent this 
condensate water build-up (see Figures 2-6 & 2-7).
Under  high  latent  load  conditions  condensate  may 
form in the base and side rails of the unit.  The unit is 
designed to contain this moisture and prevent it from 
leaking into the conditioned space.  In order to dispose 
of this condensate, two condensate drain connections 
are located on the side rails on each side of the unit 
and in the base rail on the return end of the unit.  There 
are five (5) condensate drains on the unit.  Since these 
connections are also under negative pressure, they must 
be trapped using the same design criteria as the main 
drain pan.
Condensate Drain Trap
For  “Draw-through”  applications  install  a  trapped 
condensate  drain  line  at  unit  drain  connection  (see 
Figure  2-7  according  to  all  governing  codes.  “H” 
dimension must be at least 1 inch greater than design 
Total Static Pressure (TSP) of fan.
The  trap  and  drain  lines  should  be  protected  from 
freezing. Plumbing must conform to local codes. Use 
a  sealing  compound  on  male  pipe  threads.  Install 
condensate drain lines from the 1-1/4 inch NPT female 
connections on the unit to an open drain.
The unit must be properly trapped and 
charged with water before the units 
are started.
FIG. 2-6
 –  
DRAIN TRAP SHOWING WATER 
LOCATION DURING DRAW THROUGH 
OPERATION STAGES
BASE
RAILS
BASE
RAILS
BASE
RAILS
DRAIN
NIPPLE
TRAP
NO.1 - FAN OFF
NO. 2 - TRAP CONDITION WHEN FAN STARTS
NO. 3 - FAN RUNNING AND CONDENSATE
COOLING COIL
DRAIN PAN
FIG. 2-7
 –  
TRAP DETAIL FOR DRAW THROUGH 
APPLICATION
"H" must be at least 
1 inch plus fan total
 static pressure
"X" = 1/2 "H"
LD05370-1
LD13269