INSTALLATION
7
YORK INTERNATIONAL
FORM 115.20-NOM4 (105)
PIPING
The supply and return piping must be adequately sized 
to meet the design water flow requirements as specified 
for the specific installation (see table 3 for connection 
sizes).  All chilled water piping must be insulated to 
prevent condensation.  It is also recommended that all 
piping be insulated to prevent freezing when piping is 
run in an unconditioned space.
PIPING PRECAUTIONS
•   Flush all piping prior to connection to remove 
all debris.
•   Use wet cotton rags to cool valve bodies when 
soldering.
•   Open  all  valves  (midway  for  hand  valves, 
manually open on motorized valves) prior to 
soldering.
•   When soldering to bronze or brass, heat the piping 
while in the socket/cup and begin introducing the 
solder when the flux boils rapidly.  Avoid direct 
flame into the solder joint.
•   Heat can only be applied to the cup of the valve 
body for a min i mal time before damage occurs 
(even with the use of wet rags.
•   Avoid rapid quenching of solder joints, as this 
will produce joints of inferior quality.
•  Connect  all  piping  per  accepted  industry 
standards and observe all regulations governing 
installation  of  piping  systems.    When  all 
connections are complete, the system must be 
pressure tested.  Repair any solder joint leaks and 
gently tighten any leaking valve packing nuts 
and piping accessories as required.  Hydronic 
systems are not designed to hold pressurized air 
and should only be tested with water.
TABLE 3 –  COIL CONNECTIONS 
COOLING COIL CONNECTIONS (INCHES)
YMB, YMBE, YMB-HW
SIZES 8, 10, 12
7/8" ODS
SIZES 16, 20
1-1/8" ODS
HEATING COIL CONNECTIONS (INCHES)
YMB-HW
SIZES 8, 10, 12, 16
7/8" ODS
SIZE 20
1-1/8" ODS
DRAIN PIPING
Condensate drain lines must be installed with adequate 
slope away from the unit to assure positive drain age.  
Since the drain pan is located on the suction side of 
the blower, a negative pressure exists at the drain pan 
and a minimum trap of 1-1/2 inches must be provided 
in the drain line to assure proper drainage.
Drain connections, primary and secondary, are 3/4" 
MPT.
When  connecting  piping  or  valve 
kits to fan coil units, do not bend or 
reposition the coil header tubing for 
alignment purposes.  This could cause 
a tubing fracture resulting in a water 
leak when water pressure is applied 
to the system.
Coil freeze protection is recommended 
for applications where the fan coil is 
located in ambient air locations (attics, 
crawl spaces, etc.) or within structures 
that may be unoccupied during freez-
ing conditions.  Consult the factory for 