York YPAL 050 User Manual

Page of 168
27
2
JOHNSON CONTROLS
FORM 100.50-NOM6 (1207)
GENERAL ARRANGEMENT DRAWINGS (CONTINUED)
FIG. 2-4 – GENERAL ARRANGEMENT DRAWING (CONT.)
BOTTOM SUPPLY / REAR RETURN
LD08296
76.48
7.76
6.36
36.28
66.00
227.25
195.00
1
1.00
46.00
60.00
1-1/4" FPT
DRAINS
BOTH SIDES
39.00
82.00
30.00 DOOR
SWING 
CLEARANCE
BOTH SIDES
78.00 CLEAR
FOR COIL
 PULL
92.00
100.50
AIRFLOW
106.00
1.50
339.00
91.00 
CLEAR
FOR COIL
PULL
120.00 CLEAR
84.00 
CLEAR
170.31
ELECTRICAL
 SER
V
ICE
136.82
60.00 CLEAR
FOR AIR 
INT
A
KE
BOTH SIDES
OA
OA
CO
DP
FS
CC
_F
EE
FE
T
O
P
 VIEW
FRONT
 VIEW
REAR VIEW
SIDE VIEW
(LEFT
 SIDE)
NOTES:
1.  10’
 clearance minimal over the top of the condensing unit.
2.  Only one adjacent wall can exceed unit height.
3.  12’
 clearance required to adjacent units.
4.  8’
 service access recommended on one side.
5.  Economizer and exhaust hoods, where applicable are folded inside unit for shipment.
SECTION DESCRIPTIONS:
 EE = Economizer
FE = Fan Exhaust
_F = Filter Segments
CC = Cooling Coils
FS = Supply Fan
DP
 = Discharge Plenum
CO = Condenser Section