York YPAL 050 User Manual

Page of 168
56
Maintenance
JOHNSON CONTROLS
FORM 100.50-NOM6 (1207)
Condenser Coils
Dirt should not be al lowed to accumulate on the 
con dens er coil surfaces. Cleaning should be as often 
as nec es sary to keep coil clean.
PERIODIC MAINTENANCE – THREE TO SIX MONTHS
Disconnect and lock-out power from 
the unit anytime service is being per-
 formed on the fan sec tion. Failure to 
do so could re sult in serious in ju ry or 
death due to the fan turning on while 
work is in progress.
Squealing belts during starting is 
caused by slip ping belts that are not 
tensioned prop er ly.
Motor Bearing Lubrication
Bearings must be re-lubricated periodically to assure 
long life. Motor bearing should be lubricated yearly, 
but may need lu bri ca tion  more  fre quent ly,  depending 
on se vere operating conditions.
Belt Tension
Adjust the belt tension if necessary. Re quired belt 
ten sion data is supplied on the fan “skid” data plate, 
at tached to the fan housing. Never use a belt dress ing 
on the belts. If belts slip with the prop er ten sion, use a 
good grade of belt cleans er to clean the belts. Refer to 
Figures 4-1.
Never use excessive belt tension, 
as this could re sult in damaging 
the bear ing, motor pul leys or mo tor 
base. See drive label on fan housing 
adjacent to drive for spe cifi  c  de tails 
on ten sion.
When it is necessary to replace one belt in a given set, 
the entire set of belts must be replaced.
Entire Unit Inspection
In addition to the checks listed in this sec tion, pe ri od ic 
over all inspections of the unit should be ac com plished 
to en sure proper equipment operation. Items such as 
loose hardware, component operation, refrigerant leaks, 
un usu al noises, etc. should be investigated and cor rect ed 
immediately.
Sheave Alignment:
To check sheave alignment, a straight edge or a piece of 
string can be used. If the sheaves are properly aligned, 
the string or straight edge will touch at all points, as 
in di cat ed in Figure. 4-1. Rotating the sheaves will 
de ter mine if the sheave is wobbly or the drive shaft is 
bent. Align ment error must be corrected to avoid bear ing 
and belt failure.
Belts
New belts should be re-checked after 24 hours of 
operation.  On multiple belt adjustable pul leys, the pitch 
depth should be checked to insure iden ti cal  belt  trav el, 
power transfer and wear. Adjustable motor bases are 
pro vid ed  for  belt  adjustment.
Motor pulleys and blower shaft pulleys are locked 
in po si tion  with  ei ther set screws or split taper lock 
bush ings. All set screws and/or taper lock bolts must 
be checked for tightness and align ment be fore put ting 
equip ment  into  op er a tion.
FIG. 4-1 – SHEAVE ALIGNMENT
LD07634
CORD TOUCHING SHEAVES AT
POINTS INDICATED BY AR ROWS
CORD TIED
TO SHAFT
PERIODIC MAINTENANCE – YEARLY
Check the fan wheels and in spect the drain pan for 
sludge and foreign material. Clean if re quired.
Observe the operation of all dampers and make any 
necessary ad just ments in linkage and blade ori en ta tion 
for proper operation.