Fixing and Piping
  •  Piping must be performed by qualified personnel 
according to good refrigeration system practices.
  •  Piping materials and insulation materials must be of 
refrigerant quality.
  •  Select the pipe diameters according to the size of 
unit and cut the pipe to design length by using pipe 
cutter.
  •  Install the flare nuts and flare the end of the pipes.
  •  Check that no foreign bodies are inside the piping.
  •  Align the central of the connection pipes and tighten 
the flare nut.
  •  Fix piping with pipe clamps and check that any pipe 
vibrations  cannot  be  transmitted  to  the  building 
structure.
  •  Connect the pipe correctly.
  •  Do not apply the excessive torque.
  •  Use an appropriate bending tool to form curves and 
avoid over-tightening the refrigerant tubes.
  •  To prevent heat loss, the two lines must be insulated 
separately.
■  
Maximum Piping Length
The  suction  line  must  have  a  2%  gradient  up  to  the 
compressor on horizontal sections.
Where piping lengths are unusually long and include a 
large number of oil traps, it may be necessary to adjust 
to compressor charge.
NOTES
Unit size
18
24
30
36
48
60
(m)
30
30
30
30
30
30
REFRIGERANT PIPING CONNECTIONS
■ 
Refrigerant charge to be added per extra 
meter of piping length when more than 5 
meters.
Prefabricated refrigerant piping is available as an acces-
sory. If this is not used, piping and insulating materials 
employed must be compatible with this type of installa-
tion.
The pre-charged outdoor unit does not require charging 
if piping length is 5 m or less. However, the interconnect-
ing  piping  and  the  indoor  unit  must  be  pumped  down 
before releasing R-410A refrigerant into them from the 
outdoor unit.
  1. Remove the cap from the service valve.
  2. Connect  the  line  to  a  vacuum  pump  and  pump 
down to 5 Pa.
  3. When  pump  down  is  finished,  wait  15  minutes 
to  detect  potential  circuit  leakage.  Open  service 
valves on the outdoor unit.
Outdoor unit
Indoor unit
Gas line
Liquid line
R-410A
Note: The expansion device is located in the outdoor unit.
High pressure
Pressure tap
Manifold
Low pressure
Liquid valve
Gas valve
L
D
L
H
Unit size
Models
18
24
30
36
48
60
(g/m)
30
65
90
90
90
90