Monessen Hearth CSDV20SLP User Manual

Page of 44
58D6056
19
CSDV Series Direct Vent Gas Stove
VENTING INSTALLATION 
  Drop a plumb line from the inside of the roof to the locat-
ing hole in the ceiling. Mark the center point where the 
vent will penetrate the roof. Drill a small locating hole 
at this point. 
FLAT CEILING INSTALLATION
1.  Cut a 9Z\x" (241 mm) square hole in the ceiling using the 
locating hole as a center point The opening should be 
framed to 9Z\x" x 9Z\x" (241 x 241 mm) inside dimensions 
as shown in Figure 26 using framing lumber the same 
size as the ceiling joist. If the area above the ceiling is 
an insulated ceiling or a room, nail firestop from the top 
side. This prevents loose insulation from falling into the 
required clearance space. Figure 23. Otherwise, install 
firestop below the framed hole. The firestop should be 
installed with no less than three nails per side. Figure 
26
FP1969
firestop w room above
Figure 25 - 
If area above is a room, install firestop above framed 
hole as shown 
Firestop 
Nails
FP1969
FP1970
firestop no room
956O
"
956O
"
Figure 26 - 
If area above is not a room, install firestop below 
framed hole as shown 
Nails
Firestop 
FP1970
2.  Assemble the desired lengths of pipe and elbows nec-
essary to reach from the burner system flue up through 
the firestop. Be sure pipe and elbow connections are 
fully twist-locked. Page 15, Figure 16
3.  Cut a hole in the roof using the locating hole as a center 
point. (Cover any exposed open vent pipes before cut-
ting hole in roof). The 9Z\x" x 9Z\x" (241 x 241 mm) hole 
must be measured on the horizontal. Actual length may 
be  larger  depending  on  the  pitch  of  the  roof.  There 
must be a 1" minimum clearance from the vent pipe to 
combustible materials. Frame the opening as shown in 
on Page 16, Figure 17.
4.  Connect a section of pipe and extend up through the 
hole.
NOTE: If an offset is needed to avoid obstructions, you 
must support the vent pipe every three (3) feet. Use wall 
straps  for  this  purpose.  Page  18,  Figure  24.  Whenever 
possible, use 45° elbows instead  of 90° elbows. The 45° 
elbow offers less restriction to the flow of the flue gases 
and intake air.
5.  Place the flashing over the pipe section(s) extending 
through  the  roof.  Secure  the  base  of  the  flashing  to 
the roof and framing with roofing nails. Be sure roofing 
material overlaps the top edge of the flashing as shown 
in Page 18, Figure 24. There must be a 1" clearance 
from the vent pipe to combustible materials.  
6.  Continue to add pipe sections until the height of the vent 
cap meets the minimum building code requirements.
NOTE:  You  must  increase  vent  height  for  steep  roof 
pitches. Nearby trees, adjoining roof lines, steep pitched 
roofs, and other similar factors may cause poor draft or 
down-drafting  in  high  winds.  Increasing  the  vent  height 
may solve this problem.
NOTE: If the vent pipe passes through any occupied areas 
above the first floor, including storage spaces and closets, 
you must enclose pipe. You may frame and sheetrock the 
enclosure with standard construction material. Make sure 
to meet the minimum allowable clearances to combustibles. 
Do not fill any of the required air spaces with insulation.
CATHEDRAL CEILING INSTALLATION
ImpORTANT: Review all information on previous page 
before  planning  this  installation.  Cathedral  ceiling 
installations can be very tricky. 
1.  Remove shingles or other roof covering as necessary 
to cut the rectangular hole for the support box. Mark the 
outline of the cathedral ceiling support box on the roof 
sheathing using the locating hole as a center point.
2.  Cut the hole 1/8" larger than the support box outline. 
Figure 27.