Honeywell 25/50ZST User Manual

Page of 144
46
Audio Command Center Series Manual — P/N 51889:E1  6/8/2010
Installation
Operating Power
 
3.3  Operating Power
AC Power and Earth Ground Connection
Primary power source for the ACC-25/50, ACC-25/50ZS, and ACC-25/50ZST is 120 VAC, 60 Hz, 
1.5 amps.  Overcurrent protection for this circuit must comply with Article 760 of the National 
Electrical Code (NEC) and/or local codes.  Make certain that the AC mains circuit breaker is off 
before making any wiring connections between the mains and the panel.  Run a pair of wires (with 
ground conductor) from the protected premises main breaker box to TB3 of the main circuit board.  
!
WARNING: RISK OF EQUIPMENT DAMAGE AND PERSONAL INJURY
SEVERAL DIFFERENT SOURCES OF POWER CAN BE CONNECTED TO THIS PANEL.  DIS-
CONNECT ALL SOURCES OF POWER BEFORE SERVICING. THE PANEL AND ASSOCIATED 
EQUIPMENT MAY BE DAMAGED BY REMOVING AND/OR INSERTING CARDS, MODULES OR 
INTERCONNECTING CABLES WHILE THIS UNIT IS ENERGIZED.  BE SURE TO OBSERVE 
PROPER GROUNDING AND HANDLING PROCEDURES.
Backbox
Transformer Mounting Studs
ac
c25bk
b.wm
f
Transformer Mounting Slots
Main Circuit Board 
Mounting Studs
P1 Connector - 
Transformer
a
c2
5x
m
n
t.
w
m
f
 AC Terminal TB3
P10 Connector - Battery
Transformer Assembly
Figure 3.4  Installation of Power Supply Transformer