PVI Industries PV500-47C User Manual

Page of 40
PV500-47C  06/12
 
TABLE OF CONTENTS 
1. Safety 
Considerations 
2. 
Standard Features and Equipment  
 2.1 
Performance 
 2.2 
Pressure 
Vessel 
 2.3 
Heat 
Exchanger 
 
2.4 
Code and Standards 
 
2.5 
Burner, Operating Controls & Safeties 
 
2.6 
Warranty and Service Policy (see warranty and service policy for details) 
 2.7 
Miscellaneous 
3. Product 
Descriptions 
4. 
Water Heater Installation 
 
4.1 
Checking Equipment Before You Install 
 4.2 
Codes 
 4.3 
Electrical 
Requirements 
 
4.4 
Handling and Location 
 4.5 
Service 
Clearances 
 
4.6 
Clearances to Combustible Surfaces 
5. 
General Piping Guidelines 
 
5.1 
Inlet and Outlet Connections 
 
5.2 
Building Return Piping 
6. 
Condensate Drain, Trap & Disposal 
 
6.1 
Condensate Neutralization System (optional) 
7. 
Gas Supply and Piping 
 
7.1 
Gas  Train and Controls Certification 
 7.2 
Gas 
Control 
Trains 
 7.3 
Inlet 
Pressure 
 7.4 
Manifold 
Pressure 
 
7.5 
Gas Piping Size 
 
7.6 
Appliance Isolation during Gas Supply Piping Pressure Test 
 7.7 
Gas 
Connection 
8. 
Combustion and Ventilation Air 
 
8.1 
Equipment Located in Confined Spaces 
 
8.2 
Maximum Allowed Remote Combustion Air Inlet Length 
 
8.3 
Remote Combustion Air Cap 
 
8.4 
Vertical or Horizontal Remote Air Duct Termination 
 
8.5 
Remote Air Consideration for Combined Remote Air Ducting 
9. Venting 
 
9.1 
Venting the TRICON 
 
9.2 
Maximum Category IV Vent Length 
 
9.3 
Vertical or Horizontal Vent Termination 
 
9.4 
Combining Category IV Vents