Cornelius 629087401 Leaflet

Page of 2
2
620918801
4. Place each drain line a minimum of 2--inches up from
the wire form feet and tighten each clamp bolt in place to
firmly secure the drin line(s) in place. The collar is omitted
for clarity.
5. Check for kinks and eliminate them. If necessary,
add appropriate size 45°barb to barb connectors.
INSTALLATION PROCEDURE FOR FLOOR DRAINS WITH FUNNELS
6. Mount the wire form support in the center of the floor drain
funnel and clamp it’s four legs of the support onto the drain
funnel securely. If necessary, reform the legs to fit and
attach firmly to the drain funnel.
10. Check for kinks and eliminate them. If necessary,
add appropriate size 45°barb to barb connector(s).
7. The funnel takes the place of the plastic splashguard
collar. The collar is unnecessary and can be discarded.
8. The adjustable clamps will accomodate 1/2--inch,
3/4--inch, and 1--inch I.D. either soft or ridgid (hard)
PVC tubing. Squeezing the two tabs together that are
located on the clamp--locking collar will loosen a
tightened clamp.
9. Place each drain line 2--inches up from the top of the
funnel and tighten each clamp bolt in place to firmly
secure the drain line(s) in place.