StorageTek 6 User Manual
220 VM/HSC 6.0 System Programmer’s Guide
1st ed., 6/30/04 - 312579601
This example specifies BACKup with the SLSCNTL statement to identify the primary
control data set. Backup is processed without a secondary control data set and journals.
control data set. Backup is processed without a secondary control data set and journals.
JCL for Backup of the Primary CDS without Secondary and Journals
Output Description
Output resulting from the execution of the BACKup utility includes:
• the following data sets:
- backup of the library control data set
- copies of the primary and secondary control data sets
- reset of the control data set journals.
- copies of the primary and secondary control data sets
- reset of the control data set journals.
• a listing of input commands with appropriate messages when syntax errors occur
• messages associated with backup processing
Note: These messages may include error conditions.
• an ‘‘Errant and In-transit Location Report’’ (refer to Figure 11 on page 222)
Note: This report is normal. In-transit and possibly errant VOLSERs are normal
when the HSC is active.
when the HSC is active.
• a ‘‘Block Processing Report’’ and a “Block Record Element Discrepancy Report,”
which may include reports of mismatches between the primary and secondary CDS
(refer to Figure 11 on page 222)
(refer to Figure 11 on page 222)
Note: Unselect cards may be generated during a good backup of a primary and
secondary CDS that match.
secondary CDS that match.
/JOB jobname SLUADMIN
/PARM MIXED
/FILE SLSBKUP DEV vaddr DSN backup.set.name
/FILE SLSCNTL DEV vaddr DSN primary.set.name
/FILE SLSPRINT DEV PRNT CLASS A
/FILE SLSIN *
BACKUP
Backup