Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-523
DIOD-DS1 (DS1 DIOD Trunk) 
9
System Technician-Demanded Tests: Descriptions 
and Error Codes
Always investigate tests in the order they are presented in the table below. By 
clearing error codes associated with the 
NPE Crosstalk Test, for example, you 
may also clear errors generated from other tests in the testing sequence.
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the selected 
time slot and never crosses over to time slots reserved for other connections. If 
the NPE is not working correctly, one-way and noisy connections may be 
observed. This test is usually only part of a port’s Long Test Sequence and takes 
about 20 to 30 seconds to complete.
Table 9-212.
System Technician-Demanded Tests: DS1-BD
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
1.
D = Destructive, ND = Non-destructive
NPE Crosstalk Test (#6)
X
ND
Conference Circuit Test (#7)
X
ND
DS1 Dial Tone Test (#314)
X
X
ND
Port Audit and Update Test (#36)
X
X
ND
Continued on next page
Table 9-213.
TEST #6 NPE Crosstalk Test 
Error 
Code
Test 
Result
Description/ Recommendation
ABORT
System resources required for this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000
ABORT
System resources required to run this test are not available. The port may be in 
use on a valid call. 
1. Use the status station or status trunk command to determine when the 
port is available for testing.
2. Retry the command at 1-minute intervals a maximum of 5 times.
1001
ABORT
System resources required for this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page