Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-639
DS1-FAC (DS1 Facility) 
9
The system will not allow the last packet DS1 facility to be busied out. In this 
case, the DS1 CONV circuit pack must be busied out instead.
When the busyout ds1-facility command is executed, software communicates 
with both DS1 CONV circuit packs in the DS1 CONV Complex. If the board at 
which the facility is being busied out is not accessible, then the abort code 2100 
will be returned, if the board at the other end of the DS1 CONV Complex is not 
accessible, then the abort code 105 will be returned.
DS1 Facility Administration
DS1 facility administration is a part of the fiber link administration. DS1 options 
are set on the second page of the fiber link administration screen. In Critical 
Reliability systems, the third page of the fiber link administration screen contains 
the DS1 facility options for the B side of the PNC.
DS1 facility administration is explained in the following sections. Descriptions 
given here do not provide complete coverage of fiber link administration. See the 
DEFINITY ECS Release 5 Implementation Manual (555-230-302).
Replacing a DS1 Facility
Disconnecting a DS1 facility is service disrupting except on Critical Reliability 
Systems since they have PNC duplication.
On a Standard Reliability or High Reliability System (no PNC Duplication):
This procedure is destructive.
1. Busyout the DS1 facility via the busyout ds1-facility command.
2. Replace the DS1 facility.
3. Release the DS1 facility via the release ds1-facility command.
On a Critical Reliability System (PNC Duplication):
This procedure is non-destructive.
1. If the DS1 facility to be replaced is on the active PNC (its yellow LED will 
be on solid), first do a PNC demand interchange via the reset pnc 
interchange
 command. (The status pnc command can also be used to 
determine the active PNC.)
2. When the DS1 facility to be replaced is on the standby PNC (if the DS1 
facility was originally on the standby PNC or after the PNC interchange 
has finished), busyout the DS1 facility via the busyout ds1-facility 
command.
3. Replace the DS1 facility.
4. Release the DS1 facility via the release ds1-facility command.