Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-728
DUP-CHL (Duplication Interface) 
9
5. Use the status spe command to determine if 
Standby Refreshed? 
yes
 for 
Mode: standby
 is displayed.
If the standby is refreshed, a hard switch will not affect customer 
service. Continue with step 6.
If the standby is not refreshed, you will need to execute a hard 
switch that 
will affect customer service (by at least dropping current 
calls). Notify the customer and establish a time to perform this 
disruptive maintenance.
6. Hard switch into the standby SPE by moving both SPE Select switches to 
the position that selects the standby SPE as active.
If the interchange was successful, replace the standby DUPINT 
using the replacement procedure for the standby DUPINT.
Replacing the Duplication Interface 
Interconnecting Cable
This procedure is used after replacing both DUPINT circuit packs has failed to 
resolve the duplication channel failure.
1. Use the busyout spe-standby command to lower the standby State of 
Health to partially functional to prevent an unwanted interchange during 
the Duplication Interconnecting cable replacement and testing.
2. Manually lock the active SPE. This is done by moving the SPE select 
switches located on the front of the DUPINTs to positions where they are 
both selecting the current active SPE.
3. Whenever locking the SPE, 
always verify that the active PPN Tone/Clock is 
in the active SPE carrier 
before doing any repair activity on the standby 
SPE carrier such as powering down. Enter status port-network 1 to 
check which clock is active. Remove power from the standby SPE carrier 
by pulling the power cords located on both sides of the carrier. Power 
must be removed from the standby carrier. If power is not removed 
from the standby SPE carrier before the interconnecting cable is 
disconnected, an interchange to the standby SPE will occur, causing 
disruption of customer service.
4. Examine the cable and associated connectors for obvious problems. 
Check for broken or bent pins, and repair or replace before installing the 
new cable.
!
CAUTION:
This cable interconnects the powered down standby and the active 
carriers. Use extreme caution. Shorting pins can cause the active 
SPE to fail. Consider replacing this cable during periods of light 
traffic or, ideally, when both carriers are powered down (system out 
of service).