9
system, a Packet Interface circuit pack failure causes an SPE interchange, which 
allows the link to be recovered quickly over the newly active Packet Interface. Or 
on a Center Stage Switch, a link carried on one of the multiple fibers 
interconnecting the switch nodes may be rerouted over an alternate fiber.
If the EAL is recovered quickly, the EPN Warm Restart returns the EPN to service 
with minimal effects on user service. If the EAL cannot be recovered quickly, the 
EPN is taken out-of-service and an EPN Reset Level 2 (EPN Cold Restart) is 
required to return it to service.
EPN Cold Restarts
If the PPN to EPN link has failed and has not been recovered within 30 seconds, 
the EPN is taken out of service and can be brought back into service only with an 
EPN Reset Level 2 (EPN Cold Restart). Effects of an EPN Cold Restart include a 
reset of all circuit packs in the EPN, and the disconnection of all calls to or from 
the EPN. Calls with both endpoints within the EPN are dropped upon recovery.
EPN Restart Escalation
EPN restarts follow an escalation strategy controlled by maintenance software. 
Whenever a request for an EPN Reset Level 1 (EPN Warm Restart) is made, 
software checks to see if the restart should be escalated to an EPN Reset Level 2 
(EPN Cold Restart). If any of the following are true, the restart is escalated:
At least two level 1 restarts have occurred and less than two hours has 
elapsed since the last occurrence.
Current EPN conditions do not allow a level 1 restart, such as when the 
EPN is out-of-service.
Less than 3 minutes has elapsed since the last EPN Cold Restart, 
indicating that the EPN is unstable.
If two EPN Cold Restarts have been executed in less than an hour and the link is 
functional, but the EPN has not recovered to an in-service state, a MAJOR alarm 
is raised against EXP-PN, and the EPN is put into Emergency Transfer by system 
software. (Software can invoke EPN Emergency Transfer only when the link to the 
EPN is up. If the link is down, the hardware automatically invokes Emergency 
Transfer 1 minute after it detects a link failure).
Connectivity Alarming
When an EPN is out of service, a MAJOR EXP-PN alarm is raised against that 
EPN. An EPN can only be alarmed if it is out of service 
and the fiber between the 
PPN and EPN is up. If the fiber from the PPN to the Center Stage Switch is down 
(by removing it from administration, for example), all EPNs are lost but not 
alarmed, since they are not the cause of the problem. If, however, connectivity is 
restored and the EPN fails to recover, the EPN is alarmed.