Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1739
TIE-DS1 (DS1 Tie Trunk) 
9
Hardware Error Log Entries and Test to Clear 
Values
Table 9-652.
DS1 Tie Trunk Maintenance Error Log Entries
Error 
Type
Aux 
Data
Associated Test
Alarm 
Level
On/Off 
Board
Test to Clear Value
0
1
1.
Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the appropriate
test description and follow the recommended procedures.
0
Any
Any
Any
test trunk 
grp/mbr
1(a)
57476
57477
57485
57487
15(b)
Any
Port Audit and Update 
Test (#36)
18(c)
0
busyout trunk 
grp/mbr
WARNING
OFF
release trunk 
grp/mbr
2
2.
For TN767B vintage 8 or 9 circuit packs, a failure of Test #136 causes a subsequent failure of Test #7.
Test #136 is part of the short sequence and generates off-board alarms. Test #7 is part of the long
sequence and generates on-board alarms. Before entering busyoutreleasereset or test board long
commands, check the vintage number of the circuit pack with list configuration board UUCSS. If it is
TN767B vintage 8 or 9, do not use the above commands until first making sure that Test #136 passes
via test board short. Otherwise, extraneous on-board alarms may be generated.
130(d)
None
WARNING
ON
test trunk 
grp/mbr
257(e)
57473
57474
513(f)
57392
DS1 Tie Trunk Seizure 
Test (#136)
MIN/MAJ
3
769(g)
57393
DS1 Tie Trunk Seizure 
Test (#136)
MIN/MAJ
3
1025
DS1 Tie Trunk Seizure 
(Test #136)
MIN/ WRN
4
OFF
test trunk 
grp/mbr r 2
1281
Conference Circuit 
(Test #7)
MIN/ WRN
4
ON
test trunk 
grp/mbr l r 4 
2
1537
NPE Crosstalk Test 
(#6)
MIN/ WRN
4
ON
test trunk 
grp/mbr l r 3 
2
1793(h)
test board UUCSS long 
2
2305(i)
50944
DS1 Tie Trunk Seizure 
Test (#136)
MIN/MAJ
3
OFF
2562(j)
16665
2817(k)
52992
3840(l)
Any
Port Audit and Update 
(Test #36)