Lucent Technologies Release 7 User Manual

Page of 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Object Repair Procedures 
9-1800
TONE-PT (Tone Generator) 
9
1000Hz at +3.0 dB
525Hz at 11.0 dB
1400Hz at 11.0 dB
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
SAKI 
Reset Test for example, you may also clear errors generated from other tests in 
the testing sequence.
Notes:
a. Refer to XXX-BD (Common Port Circuit Pack) section for descriptions of 
these tests.
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
Reset Board 
Sequence
D/ND
1
1.
D = Destructive; ND = Nondestructive
SAKI Reset Test (#53) (a)
X
D
Clock Health Test (#46) (b)
X
X
ND
Control Channel Looparound Test 
(#52) (a)
X
X
ND
Tone Generator Crosstalk Test (#90)
X
ND
Tone Generator Transmission Test 
(#40)
X
X
ND
Tone Generator Audit/Update Test 
(#41)
X
X
ND
TDM Bus Clock Circuit Status Inquiry 
Test (#148) (c)
X
X
ND
TDM Bus Clock Slip Inquiry Test 
(#149)(c)(e)
X
X
ND
TDM Bus Clock PPM Inquiry Test 
(#150) (c)
X
X
ND
TDM Bus Clock Parameter Update 
Test (#151) (c)
X
X
ND
Board Type Check Test (#574) (c)
X
X
ND
Standby Reference Health Check Test 
(#651) (c,d)
X
ND